Gareth Dobinson

Gareth started his career in engineering with an industrial placement during his third year at Loughborough University. The twelve months were spent working for Xerox as a Systems Engineer where he undertook a wide range of engineering work as well as developing a system to monitor paper control timings for a paper transport module. As part of his placement he spent five months working in Venray, Netherlands, integrating new products into the manufacturing line. On completion of his placement he received a bursary from Xerox for the final two years of his degree. His final year project was sponsored by Xerox and investigated “The environmental effects on glass reinforced plastic”. After completing his degree Gareth joined Xerox on their Graduate Engineering programme based in Welwyn Garden City. During his five years at Xerox, Gareth obtained a wealth of experiences in both the mechanical and software aspects of engineering. He started working in the Mechanical group where he was the lead engineer on a paper handling module. This was followed up by two long term assignments to Senai, Malaysia and Wilsonville, USA. During his third year at Xerox Gareth undertook a conversion course in Software Engineering. The skills learnt on this […]
Andrew Reeves

Andrew graduated from Cambridge University in 1992 with a first class degree in Engineering Science, specialising in geotechnics, structures and materials. He was sponsored by Ove Arup & Partners both before and during university gaining over a years’ worth of experience on site and in the design office. On graduation he joined Arup’s geotechnical division in London and then spent the next 7 years in London, Berlin and Hong Kong on the design and site-supervision of large infrastructure projects such as Canary Wharf towers, Merrill Lynch HQ, Berlin Velodrome and Swimming Pool and The Centre, HK. During this time Andrew specialised in the design and construction of deep basements, retaining walls and foundations using diaphragm walls and large diameter piles. He also studied for a master’s degree in Soil Mechanics at Imperial College, with his thesis on the effects of rising groundwater on bored piles in London, graduating with a distinction. In 1999 Andrew joined a strategy consultancy, Mars & Co, where he carried out numerous projects on behalf of blue-chip companies in UK, Turkey, USA and France. In 2007 Andrew formed his own company carrying out both business and engineering consultancy projects for a range of clients. He expanded […]
Andrew Prickett

As part of his first degree Andrew worked for Alusuisse, Switzerland analysing production methods of lithographic alloys and for the Defence Evaluation and Research Agency on new materials for aerospace applications. His career in failure investigation began while carrying out his PhD, which was an investigation to determine the failure characteristics of fibre reinforced composite materials using fracture mechanics and surface analytical techniques, that was sponsored by BAE Systems. After completing his PhD, Andrew continued his interest in failure investigation by undertaking a post-graduate research project for Thames Water on the failure modes of cast iron trunk mains systems.In 2001 Andrew joined Hawkins, specialising in the investigation of materials failures, escapes of water, fires and explosions. He has investigated a wide range of failures in plastic, ceramic, metal and composite materials. He also uses his engineering knowledge and experience of the processes required for a forensic investigation to determine the causes of fires in residential, commercial and industrial premises.Andrew is experienced in the legal process; he is frequently appointed as a Single Joint Expert and has given evidence in the capacity of an expert witness in Magistrates’ and Crown Courts. In 2022, Andrew was promoted to Managing Director and is […]
Swimming Pool Slip Incident

In July 2009, a guest at a large hotel in Swansea slipped and fell whilst walking on the surround of the hotel’s swimming pool. Minutes afterwards, after recovering from that fall, the guest fell a second time, sustaining severe personal injuries.
Potters Bar Derailment Investigation

On 10 May 2002 the 12.45 Kings Cross to King’s Lynn train derailed just south of Potters Bar station. Seven people died; six on the train and a pedestrian struck by debris. Numerous people were injured.